A stipulation in Texas-
The settlement was signed by TNMP, PUCT Staff, the Office of Public Utility Counsel, Texas Industrial Energy Consumers, the State of Texas, and several cities with original jurisdiction. TXU Energy and Reliant Energy do not oppose the settlement.
Under the stipulation, residential distribution service charges would be as follows:
Residential Current New
Customer
Charge (per ESI ID per month) $1.40 $4.00
Metering Charge (per ESI
ID per month) $2.20 $1.25
Transmission System Charge ($/kWh) $0.004980 $0.00
Distribution
System Charge ($/kWh) $0.017578 $0.017347
As suggested by the rates above, TNMP would remove wholesale transmission costs from its base rates under the stipulation, and recover all such transmission costs through the Transmission Cost Recovery Factor (rates provided below).
The stipulation provides that, prior to its next general rate case, TNMP will perform a load profile study for its specific customers and service areas, for use in allocating costs among customer classes.
TNMP is to also continue the existing demand ratchet waivers for the Secondary Service
> 5 kW and Primary Service classes under the settlement. TNMP, in a proposal supported
by Staff, had originally proposed to remove the demand ratchet waiver for Municipal
Pumping customers with a peak annual demand of more than 20 kW in the prior 12-
TNMP's proposed Storm Hardening Cost Recovery Factor (SHCRF) Rider would not be approved under the stipulation. Based on the pro forma tariff leafs, there would apparently be no changes in discretionary service charges under the stipulation.
Under the stipulation, distribution service charges for the Secondary Service Less
Than Or Equal To 5 kW class would be as follows:
Secondary <= 5 kW Current New
Customer
Charge (per ESI ID per month) $2.50 $2.50
Metering Charge (per ESI
ID per month) $2.20 $2.20
Transmission System Charge ($/kWh) $0.007789 $0.00
Distribution
System Charge ($/kWh) $0.029612 $0.033323
Distribution service charges for the Secondary Service Greater Than 5 kW class would
be as follows:
Secondary > 5 kW Current New
Customer
Charge (per ESI ID per month) $4.25 $2.56
Metering
Charge (per ESI ID per month) $13.30 $10.74
Transmission
System Charge
Non-
IDR Metered (per 4CP kW) $1.1200
$0.00
Distribution System Charge (per NCP Billing kW)
Non-
IDR
Metered $5.50 $5.2808
Distribution service charges for the Primary Service class would be as follows:
Primary
Current New
Customer
Charge (per ESI ID per month) $22.00 $34.50
Metering
Charge (per ESI ID per month) $265.00 $204.98
Transmission
System Charge
Non-
IDR Metered (per 4CP kW) $2.5966 $0.00
Distribution
System Charge (per NCP Billing kW)
Non-
IDR
Metered $4.80 $5.1286
Charges under the retail delivery tariff for Transmission Service voltage levels
would be as follows:
Transmission Voltage Current New
Customer
Charge (per ESI ID per month) $180.00 $214.51
Metering
Charge (per ESI ID per month) $3,994.47 $1,751.67
Transmission
System Charge (Per 4CP kVA) $1.800 $0.00
Distribution System
Charge (Per 4CP kVA) $0.0399 $0.00
The Transmission Cost Recovery Factor would be established as follows:
TCRF Current New
Residential
($/kWh) $0.000603 $0.006450
Secondary
<= 5 kW ($/kWh) $0.001314 $0.004318
Secondary Service
> 5 kW
Non IDR Metered (Per NCP kW) $0.138251 $1.5194
IDR
Metered (Per 4CP kW) $0.220103 $2.0500
Primary
Service
Non IDR Metered (Per NCP kW) $0.130902 $2.0622
IDR Metered (Per 4CP kW) $0.196127 $2.2538
Transmission
Service (Per 4CP kVA) $0.218034 $2.0663
Copyright 2010 Energy Choice Matters. If you wish to share this story, please email or post the website link; unauthorized copying, retransmission, or republication prohibited.
Be Seen By Energy Professionals in Retail and Wholesale Marketing
Run Ads with Energy Choice Matters
Call Paul Ring
954-
Consulting |
Abbreviations |
Search |