Consulting |
Abbreviations |
Search |
Allegheny Power Posts Maryland Type II Rates
Email This Story
November 2, 2010
Allegheny
Power has posted updated Type II generation rates in Maryland as a result of the
recent SOS procurement.
Schedule C: General and Commercial Service
Type II SOS: 12/1/10 through 2/28/11
Energy
Charge
First Block (0-
Second Block (next 350 kWh) 10.798¢/kWh
Third
Block (over 700 kWh) 4.232¢/kWh
Schedule G: General Service
Type II SOS: 12/1/10 through 2/28/11
Capacity Charge
All
kW in excess of 7.5 measured as set forth under "Determination of
Capacity" $6.95/kW
Energy
Charge
First Block (0-
Second Block (over 700 kWh) 4.230¢/kWh
Schedule C-
Type II SOS: 12/1/10 through 2/28/11
Energy
Charge
First Block (0-
Second Block (next 350 kWh) 10.592¢/kWh
Third
Block (over 700 kWh) 5.579¢/kWh
Schedule C-
Type II SOS: 12/1/10 through
2/28/11
Energy Charge
All kWh 6.434¢/kWh
Schedule PH: Light and Power Service
Type II SOS: 12/1/10 through 2/28/11
Capacity
Charge
First Block (0-
Second Block (over 500
kW) $12.77/kW
Energy Charge
First Block (0-
Second
Block (over 100,000 kWh) 2.658¢/kWh
Copyright 2010 Energy Choice Matters. If you wish to share this story, please email or post the website link; unauthorized copying, retransmission, or republication prohibited.
Be Seen By Energy Professionals in Retail and Wholesale Marketing
Run Ads with Energy Choice Matters
Call Paul Ring
954-
Consulting |
Abbreviations |
Search |